Renewables

Austria’s Verbund acquires 272 MW wind project in Romania

verbund wind farm project romania monsson

Photo: Pexels

Published

April 11, 2025

Country

Comments

comments icon

0

Share

Published:

April 11, 2025

Country:

Comments:

comments icon

0

Share

Verbund Wind Power Romania, a subsidiary of Austria’s Verbund, has acquired a 272 MW wind project from Monsson, a Sweden-based renewable energy group. The project, taken over at a ready-to-build stage, is expected to enter the construction phase in 2026.

The planned wind farm in Caraș-Severin county in Romania is expected to produce 569 GWh of electricity annually, Verbund said in a press release.

Verbund has been present in the Romanian renewables market since 2012, operating the 226 MW Casimcea wind farm in Tulcea county. It also has a portfolio of wind and photovoltaic projects under development.

Verbund already operates a 226 MW wind farm in Romania

Adrian Borotea, General Manager of Verbund Wind Power Romania, said the company looks forward to future opportunities that can help speed up the country’s energy transition. “In Verbund, we continuously seek to stimulate the growth of the clean energy sector in Romania, in line with our sustainable approach to business,” he stressed.

Sebastian Enache, Head of Mergers and Acquisitions and member of the Board of Directors of Monsson, said the need for clean energy as a central point of the energy sector development in Romania and Europe is growing, adding that the company is proud to have started this cooperation with Verbund, one of the largest producers of electricity from renewable sources in Europe.

The Austrian utility expects 25% of its overall electricity output to be generated from solar and wind energy by 2030, with Romania seen as one of the strategic target markets to achieve the objective.

Monsson has over 5 GW of solar and wind projects in Romania

Monsson has a portfolio of more than 5 GW of wind and solar projects in Romania. It offers a full range of services, including the design, development, construction, and operation of renewable energy power plants, as well as the construction and operation of battery-based energy storage solutions.

The company recently said it was preparing to build a manufacturing facility in the Romanian town of Petrila to produce renewable energy equipment, including robots that clean solar panels.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment

Related Articles

bih republic of srpska hydropower plants bistrica tunnels petar djokic

Three hydropower plants on Bistrica river to be finished by end-2026

18 April 2025 - Chinese company AVIC is in charge of building the three hydropower plants on the Bistrica, with a total capacity of 39 MW

albania france kesh afd drin hydropower energy storage

Albania’s KESH, France’s AFD sign MoU on hydropower management, energy storage 

18 April 2025 - KESH and Agence Française de Développement have signed an MoU on the Drin cascade management and advanced energy storage planning

bih federation ephzhb court poklecani urban permit arhaus

Supreme Court of Federation of BiH annulls urban permit for Poklečani wind farm

17 April 2025 - The project is being developed by Elektroprivreda HZHB, one of the three state-owned power utilities in Bosnia and Herzegovina

Minister Admir Sahmanović formally assumes energy, mining portfolio in Montenegro

Minister Admir Šahmanović formally assumes energy, mining portfolio in Montenegro

17 April 2025 - Minister of Energy and Mining of Montenegro Admir Šahmanović was formally voted in as the two ministries that he ran were merged